Hardware projects may take longer. For now the following tasks are to be done on hardware level:
- To confirm the heat dissipation components
- Adjusted and optimized screen and other components are assembled into the whole machine for verification and confirmation
- Plan to change the thin glass cover plate
- Complete machine to be assembled, verification test
- The structure of the partially modified mold is to be verified
We want to have a great product in the end, so some parts of the machine still need improvements and final testing.